Bull Run Supply Treatment Plant
Portland, Oregon
Project overview
Bull Run Supply Treatment project (BRST) for the Portland Water Bureau located at the Headworks site. The project was to include (3) new building structures: a 16,000-sf UV Process Bldg, a 16,000-sf Chlorine Bldg and a 5,000-sf Operations Bldg. ABHT also provided support for site retaining walls and site structures which included a 30-ft high Outfall concrete structure, and a generator pad with a steel framed screenwall, and a below grade concrete vault. This project was completed through Construction Documents.
- Published size
- 16,000 SF