Bull Run Supply Treatment Plant

Project overview

Bull Run Supply Treatment project (BRST) for the Portland Water Bureau located at the Headworks site. The project was to include (3) new building structures: a 16,000-sf UV Process Bldg, a 16,000-sf Chlorine Bldg and a 5,000-sf Operations Bldg. ABHT also provided support for site retaining walls and site structures which included a 30-ft high Outfall concrete structure, and a generator pad with a steel framed screenwall, and a below grade concrete vault. This project was completed through Construction Documents.

Client
Portland Water Bureau
New buildings
3
UV process building
16,000 SF
Chlorine building
16,000 SF
Operations building
5,000 SF

Site structures

The structural scope included retaining walls, a 30-foot-high concrete outfall structure, a screened generator pad, and a below-grade concrete vault.