Project overview

A 15,500-sf one-story wood-framed addition on the west end of the existing elementary school. The addition is founded on conventional concrete spread foundations with a concrete slab-on-grade floor. A seismic joint separates the addition from the existing building. Structural modifications to the existing adjacent school were required to allow access between the two buildings.

Addition
15,500 SF
Stories
1
Framing
Wood
Foundations
Concrete spread footings
Floor
Concrete slab on grade

Existing-building interface

A seismic joint separates the wood-framed addition from the modified existing school.